Prototype Notice (V16 - Corrected): Includes SVG logo & enhanced Service Alteration section. G98 & NC Dom also detailed. Other types placeholders. Data is not saved persistently. **Cannot guarantee DNO acceptance.**
Your Applications:
(No applications yet - Functionality not implemented)
Create New Application
Application Workspace
0%
Select a section from the left to begin.
1. Site Details
2. Installer Details
3. Proposed Generation Equipment (G98 Example)
4. Connection & Protection (G98 Example)
5. Supporting Documents Status
(Confirm status for planned submission. Actual files submitted directly to DNO.)
New Connection Details (Domestic 1-4 Plots)
Note: This section gathers common initial information. DNOs require detailed Site Location Plans and Site Layout Plans submitted separately. Load calculations need careful assessment. Requirements vary by DNO.
Service Alteration Details
Note: Service Alterations require an MPAN (see Site Details). Site plans showing **existing AND proposed** service/meter positions are usually mandatory and must be submitted separately. Requirements vary by DNO.
G99 Application Details
Placeholder: G99 requires extensive technical data (protection, fault levels, etc.). Refer to ENA/DNO forms.
New Connection (Commercial LV) Details
Placeholder: Commercial NC requires detailed load schedules, max demand calcs, etc. Refer to DNO forms.
EV Charge Point Connection Details
Placeholder: Use official ENA EV Chargepoint Application Form. Details depend on load/supply.